Operating the Ballast Tamper to smooth of the rails. |
Working on the right-of-way |
Working on the carbarn doors |
|
The "Brooks
Division" Track crew at work on the yard leads to the new car barn |

Painting
car # 48 at Willamette Shore Trolley (pj 06/00) |
Installing new overhead trolley wire. |
|

Backfilling the dirt after the concrete pour for Track 3 inside the carbarn |

Playing music for waiting
passengers |

Members discussing what to do
next behind the carbarn.
|
Here are two more members
working on reading the line poles to eventually carry the overhead wire
for the trolleys. |

Helping the dump truck operator put the gravel down for the new road to
the car barn. |
Checking the fuel
level for the generator. The generator supplies the current to the trolley
to run on the Willamette Shore. |

Members on a field trip on the Portland MAX Line |

Re-roofing a trolley car |

Building rebar forms for concrete foundations for steel poles. |

Waiting for passengers |

Giving Carbarn tours |

More track work |
| |
|
|